Latest news

At the thirteenth meeting of the Monitoring Committee of the OP "Environment", Methodologies and Criteria for three new Program Procedures were adopted in the sectors "Waste" and "Natura 2000 and Biodiversity".

Minister Dimov also signed an anaerobic installation contract for separately collected biodegradable waste for the municipalities of Blagoevgrad, Simitli, Boboshevo, Kocherinovo and Rila

The Minister of Environment and Water Neno Dimov signed a contract for the construction of an anaerobic installation for separately collected biodegradable waste on the territory of the Burgas region. The aim of the project is to provide infrastructure and a system for separate collection of biodegradable municipal waste in the municipalities of Burgas, Nessebar and Pomorie.

Circular economy and air cleanliness with emphasis on electromobility will be a priority in the preparation of the next programming period of Operational Programme Environment (OPE). This was announced by the Minister of Environment and Water Neno Dimov to the deputies from the National Assembly's Environment and Water Committee at an external meeting in Bansko, organized by the Committee Chairman Ivelina Vassileva. The Minister briefed the Commission on the progress of the implementation of the 2014-2020 OPE and on the preparation of the next programming period.

The Minister of Environment and Water Neno Dimov and the Mayor of Veliko Tarnovo Eng. Daniel Panov signed a contract for updating the municipal air quality program.

The aim of the new program is to define and plan adequate measures to reduce emissions and achieve the established  fine dust particles standards in the air on the territory of the municipality.

The total amount of the investment is over 180 000 BGN, provided by the Operational Programme "Environment 2014-2020". The implementation deadline is 18 months.

The team of the Operational Programme "Environment 2014-2020" (OPE) at the Ministry of Environment and Water in Bulgaria started a 3D Video Mapping Campaign, which presents in an attractive way the significance of the measures implemented under the programme. Beautiful animations recreate a true spectacle, a combination of love for nature and the mastery of technological art. The creative project tells about the path of water and beauty and diversity in nature throughout. This is the first campaign of this magnitude implemented by the OP Environment.

The project is worth BGN 22.3 million and is financed under OP Environment

Deputy Minister of Environment and Water Atanaska Nikolova participated in the first sod of the integrated investment project in the water sector of the Primorsko-Kiten agglomeration. Together with the Mayor of Primorsko Dimitar Germanov today, she gave the start of the construction works for the forthcoming modernization of the existing facility.